Know what has been requested

Sorting, containment, CSL1 and CSL2.

A practical comparison; customer-specific instructions take precedence
ActivityWhat it doesConfirm first
SortingSeparates a defined population against agreed acceptance criteria.Suspect lots, defect criteria and material-status rules.
ContainmentControls exposure to suspect material across the affected supply chain.Stock locations, traceability and who controls each hold.
CSL1 / CS1Typically adds a supplier-operated check beyond normal production controls.The customer’s written scope, reporting and exit instructions.
CSL2 / CS2Adds independent third-party inspection to the customer-defined containment process.Provider approval, check location, responsibilities and records.
Corrective actionInvestigates and addresses the cause of the nonconformity.Owner, verified action, effectiveness evidence and customer review.

For one customer-specific example, see the Controlled Shipping section of the BorgWarner Supplier Manual. Its provider approval and exit requirements are specific to that customer. This reference does not imply Pioneer is a nominated or approved provider.

A containment handover that the next shift can use.

The next inspector should be able to identify the stock, apply the current instruction and understand what remains unresolved. Agree a common quantity basis before comparing reports from different shifts or inspection points.

Suggested handover fields to agree with customer quality
RecordInclude
IdentityDate, shift, site, part, revision, lot and inspection instruction.
Quantity balanceOpening unchecked stock, receipts, inspected quantity and remaining unchecked stock.
Inspection resultsAccepted, rejected and held quantities using mutually exclusive categories.
Defect detailsDefect code, affected characteristic, quantity and evidence reference.
TraceabilityContainer or hold-tag IDs and the agreed identification of inspected material.
ExceptionsUnclear criteria, interrupted checks, instrument concerns and escalation owner.
HandoverInspector and reviewer identities, next shift action and customer communication.
Exit evidenceCustomer-required evidence and approval status; never assume automatic exit.
Download the blank shift log

CSV · planning template, not a customer-approved CSL procedure

Three reporting gaps to avoid.

  1. Mixing defect counts and affected parts.One part may have more than one defect. State whether the Pareto counts defects or parts. Do not derive accepted quantity by subtracting overlapping defect counts.
  2. Letting rechecks erase the first result.Keep the original finding and the authorised follow-up linked. Reworked parts need the agreed verification and identification before their status changes.
  3. Confusing a clear shift with exit approval.A shift with no observed defects is evidence for review. It does not by itself close controlled shipping; the customer defines and approves the applicable exit process.

Sorting identifies conforming material

Sorting checks a defined population against agreed criteria and separates accepted, rejected and uncertain parts. It may use visual, dimensional or other agreed checks.

Containment manages immediate exposure

Containment is the wider activity of identifying and controlling suspect material. It can include sorting, segregation, traceability and checks at several locations.

CSL2 adds an independent inspection step

Controlled Shipping Level 2 commonly refers to an additional independent containment step requested by a customer. The exact inspection, reporting and exit criteria are customer-specific.

Corrective action addresses the cause

Inspection and containment provide evidence and short-term control. They do not replace root-cause analysis, corrective action or the customer’s approval process. Agree responsibilities and escalation routes at the outset.